How to Apply for the Government Solar Panel Installation Scheme
How to Apply for the Government Solar Panel Installation Scheme
To apply for the government solar panel installation scheme, begin with the official PM Surya Ghar National Portal at pmsuryaghar.gov.in. Register using your state, electricity distribution company and consumer details, submit your residential rooftop application, follow the applicable DISCOM process, choose a registered vendor, and complete installation, metering, inspection and the subsidy claim.
Do not begin with a payment to an unknown agent or assume any existing installation qualifies. The exact portal screens and feasibility requirements can change. Follow the instructions shown for your consumer account and keep copies of every acknowledgement.
This article explains the PM Surya Ghar application process. If you first need to check the benefit and whether your property qualifies, read our solar panel scheme and eligibility guide. StellarGreen assists with installation planning across Odisha and West Bengal, but approval and subsidy release remain subject to the government process.
Before Applying: Check Your Connection and Roof
Read the latest electricity bill carefully. Confirm the consumer number, account-holder name, address, supply category and sanctioned load. The DISCOM should be the company supplying that connection, not a nearby provider or a company selected because another homeowner used it.
Next, establish that you have permission to install solar at the property. Check the roof's condition, access, usable area and shading. An apartment, rented property or shared roof can require additional permissions. Ask for clarification before ordering equipment if ownership and account-holder details differ.
Gather several months of consumption in electricity units. A system should be sized around actual demand and practical site conditions, not only the maximum subsidy. Include planned AC use or EV charging, but avoid relying on a promise that every future appliance will run directly from solar.
Documents Required for Solar Subsidy
The documents required for solar subsidy depend on the portal stage and local DISCOM instructions. Prepare the following records, then check the exact requested uploads. This is a preparation checklist, not a claim that every state requires every document in the same format.
- A recent electricity bill with a readable consumer number and service address.
- A working mobile number and email address for registration and notices.
- Account-holder identity or ownership/authorisation records if requested.
- Bank account details and supporting bank proof, such as a cancelled cheque or passbook page, in the required format.
- Roof-use permission or society approval when applicable.
- Vendor agreement and the selected system's technical details.
- Installation records, equipment details and commissioning documents when the relevant stage requests them.
Keep the names and bank details consistent with the application requirements. Never send an OTP to someone claiming they need it to “release” the subsidy. An installer can help organise records without taking control of your bank account or portal credentials.
Step 1: Register on the National Portal
Select the state and DISCOM matching your electricity bill and enter the consumer details requested by the portal. Complete the registration verification and retain the login information securely. Before submitting, check spelling, contact information and the electricity account number digit by digit.
The government's consumer manual describes registration and login as the starting steps [1]. If a consumer record is fetched automatically, review it rather than assuming the fetched information is correct. Contact the DISCOM if the account details need updating.
Step 2: Submit the Rooftop Solar Application
Complete the requested application fields, proposed capacity and document uploads. Save the application reference and check its status. The manual describes submission followed by the applicable technical feasibility process or waiver [1]; do not rely on an old article that says every connection follows an identical approval step.
Confirm whether work may start for your account and capacity. A vendor's general assurance is not a substitute for the portal status or your DISCOM's instruction. Ask about sanctioned-load changes or connection upgrades before fixing the final design.
Step 3: Choose a Registered Vendor and Written Scope
Use the portal's vendor selection process and confirm the vendor is registered for the applicable area. Compare complete installation offers rather than only the panel brand. A written agreement should state panel and inverter models, total capacity, mounting, protection, wiring, commissioning responsibilities and exclusions.
Verify current domestic-content and approved-equipment requirements for the claim. Ask how equipment substitutions will be documented, who handles the inspection records and who provides service after commissioning. Keep payments traceable and tied to an agreed milestone schedule.
For budgeting, see our home solar installation cost guide. All prices mentioned on the website are exclusive of taxes and may vary based on location, state regulations, and actual site requirements.
Step 4: Installation, Net Metering and Inspection
After the applicable clearance, the installer fits the approved system and records its technical details. The meter application, electrical inspection and commissioning follow the DISCOM's process. The consumer manual identifies installation details, net-meter and inspection information, and commissioning certification as distinct stages [1].
Net metering for rooftop solar uses a suitable meter to record electricity imported from and exported to the grid. Credits and settlement depend on your current regulatory and utility rules. Exported units should not automatically be valued at your retail tariff in a savings estimate.
A standard on-grid inverter generally stops supplying electricity during a grid outage. If you require backup, specify it separately with a compatible inverter, battery and protected circuits. Do not confuse a bidirectional meter with an energy-storage system.
For Kolkata connections, review our CESC application and net-metering guide, then confirm current requirements directly with the relevant utility. Other West Bengal and Odisha connections may have different processes.
Step 5: Submit Bank Details and Complete the Subsidy Claim
Once the required inspection and commissioning records are accepted, follow the portal instructions for the assistance claim and bank information. The manual's flow includes consumer subsidy redemption, release and portal payment-status updates [1]. Keep the commissioning certificate and monitor the account rather than assuming installation alone completes the claim.
There is no universal payment date promised in this guide. Processing depends on accepted records, bank verification and the implementing agencies. If a claim stalls, first identify the pending stage and correct any missing information rather than resubmitting unrelated documents.
Eligible projects can receive up to ₹1,38,000 in Odisha with applicable state support or up to ₹78,000 in West Bengal under the standard central maximum. Capacity and eligibility determine the actual benefit; neither maximum is guaranteed for every application.
Application Mistakes That Can Delay Progress
- Selecting the wrong DISCOM or entering an incorrect consumer number.
- Uploading blurred bills or bank proof with unreadable details.
- Ordering equipment before confirming the applicable process.
- Changing system capacity or equipment without documenting the change.
- Leaving metering, inspection or commissioning tasks out of the vendor agreement.
- Assuming subsidy is paid upfront or that a verbal assurance confirms eligibility.
Keep a simple record of each stage: submission date, acknowledgement, responsible party and next action. This makes it easier to follow up on a specific missing item. Your installer should explain where the project stands in plain language.
Frequently Asked Questions About Applying
Is the solar panel installation govt scheme application online?
The National Portal is the starting point for PM Surya Ghar applications. Follow its process and your DISCOM's instructions; some local checks or metering activities require coordination beyond the online submission.
Can StellarGreen apply on my behalf?
StellarGreen can assist with planning and documentation. You should retain control of your account, verify every submission and avoid sharing OTPs or banking credentials. Ask what application support is included in the installation agreement.
Can I claim assistance after installing independently?
Do not assume retrospective eligibility. Confirm the official requirements before installation; a panel invoice alone does not demonstrate compliance with the application and commissioning process.
How long does approval or payment take?
Timing varies by application stage, utility, document quality and verification. Check your actual status and current official service instructions instead of relying on a guaranteed timeline in an advertisement.
Official Reference and Installation Support
Prepared on 26 November 2026. [1] PM Surya Ghar National Portal Consumer Manual, version 1.1, July 2024: pmsg-production-public.s3.ap-south-1.amazonaws.com/download/Consumer_Manual_of_PM_Surya_Ghar.pdf. This manual supports the overall sequence; the current portal takes precedence where screens or procedures have changed.
Start at pmsuryaghar.gov.in, then use our state-specific subsidy guidance. For an installation assessment in Odisha or West Bengal, contact StellarGreen with your bill, location and proposed roof area.